Training Details
Space
- TOTAL SPACE ALLOCATION: 1320 sq ft
Training Duration
- PIPE FABRICATION: 12 Weeks
- STEEL FABRICATION: 12 Weeks
Practical Skill Testing Availability
Steel Fitter
- NO. OF BAY: 20
- MACHINES: 20 DC Arc Machine (400 Mpr)
- EQUIPMENT: Cutting Torch, Other Cutting Equipment
- TOOLS: Hammer, Chisel, Ruler, Dot Divider, Steel Tape, Marking Chalk, Scissor
Pipe Fitter
- NO. OF BAY: 20
- MACHINES: 20 DC Arc Machine (350-400 mpr)
- EQUIPMENT: Cutting Torch, Oxy-Flame Cutting Equipment
- TOOLS: Speed Level, Hammer, Chisel, Ruler, Dot Divider, Steel Tape, Marking Chalk, Scissor
Equipment and Power
- POWER: Transformer welding 300A & 400 A
Tools
- GAS CUTTING TOOLS: Cutting torch with hose and regulator LPG & CO2, Bucketing machine and Bowel cutting machine.
- FITTING TOOLS: Measuring tapes, Steel rules, Try Square, Sprit Level, Hammers, Dot Punch, Divider, Makers etc.
Training Methodology
Beginner Level
For the new candidates with Mathematical knowledge – pipe / steel fitting training method:
The candidates will be trained first about the safety rules & regulations to be followed in workplace, cold works, hot works.
Then they will be taught about the ANSI standard of using fitting tools, various materials usage, pipe and plate sizes.
Then they will be taught on the usage of pipelines in various processes.
Then practically they will be given class on marking, hand movement of the cutting torch followed by the cutting practice of the plate and then the cutting of the pipe.
Then will be the fabrication of the pipe as per isometric drawing. Finally ending up with the fabrication of the necessary fittings.
After repeated tests on marking, cutting, grinding, fittings and fabrication as per the isometric drawing will be given.
Advanced Level
For the candidates with Gas Cutting knowledge only:
First the candidates will be tested on their cutting knowledge. If failed the training methodology will be given as per the new candidates with mathematical knowledge training method.
On successfully tested they will be upgraded with the methods of fabrication as per the isometric drawing and necessary of fittings.