Menu
Training Details
Space
- TOTAL SPACE ALLOCATION: 1800 sq ft
Training Duration
- SCAFFOLDING: 8 Weeks
Practical Skill Testing Availability
- NO. OF BAY: 3 Sets
- EQUIPMENT: Pipe, Clam, Water Level, Wood
- TOOLS: Resort Range, G. I Wire
Tools
- SCAFFOLDING TOOLS: Richared Spanners, Wire cutters, Spirit Level, Measuring tapes, Markers and hammers.
- SCAFFOLDING MATERIALS: 1.5, 2, 3, 4, and 6 meter pipes; 1.5, 2, 2.5, and 3 meter planks, Base plates, Fixed, Swivel, Bone joint, and G couplers.
- SCAFFOLDING PPE: Safety Helmet, Safety Ear Plug, Safety Dust Mask, Safety Goggles, Safety Overall, Safety Hand Gloves, Safety Body Harnesse, Safety Shoe etc.
Training Methodology
First screening on the candidates – physical tests will be taken.
The selected candidates will be taught first on the usage of the PPE.
Knowledge on how to use the measuring tape will be given.
Material and tools names will be explained.
Lacing of wires, fixing of planges on pipe and planges will be taught.
Then practically will start on the various methods of scaffolding as below.
Independent Scaffolding.
Tower Scaffolding.
Cantilevered Scaffolding.
Mobile Scaffolding.
Cargo Hold Scaffolding.
Birdcage Scaffolding